Garco Construction was the prime contractor on this project. This project included reinforcement of specific truss web to girder connections with additional plate steel requiring additional bolts and replacing specific bolted connections with upgraded A490 bolts. Lower chord gusset plate connections were increased in size to meet current seismic code requirements and upper chord connections added connection points. After the existing connections were replaced and inspected, they were coated with a Zinc/Urethane paint system. All work was performed above water, while maintaining one-way alternating traffic.