Garco Construction is the general contractor for this bridge project located in Riverfront Park, Spokane, WA. The bridge will receive a new deck, repair/replacement of corroded steel floor beams, repair/replacement of lighting and electrical components, and safety upgrades to the historic railings. Work began in May 2022 and is slated to be completed by end of January 2024 so it is ready in time for the 50-year anniversary of Expo ’74.

Garco is honored to get to work on this project in the heart of downtown Spokane and return this bridge to the community as a safe route to walk through Riverfront Park and enjoy the gorgeous scenery.