The 180ā€™ x 240ā€™ pre-engineered building houses a powder coating production line and shipping/receiving facility, with finished office space and a 2,520 SF roof covered shipping area. The powder coating production line includes prep booths, self-contained air scrubbers, and multiple gas-fired convection cure ovens. High pressure gas lines were installed throughout the building along with separate water lines with a below grade oil water separator for treatment of effluents.

Download Project Information