This design-build project included a 44,100 SF pre-engineered metal building to expand the existing H2 Precast wet casting deck. The building was designed by Garco’s design department and includes the use of two 50-Ton overhead cranes running on the same runway beams. The west side of the building was designed to allow the overhead cranes to exit the building with a picked load over the exterior casting deck. All structural concrete foundations, structural steel, hoisting and rigging, metal roof panels, metal siding and slab on grade concrete scopes were performed by Garco Construction’s work forces.