Garco Construction, teamed with AM Landshaper, Inc., was the design-builder for this project featuring an upgrade to the approximately 80,000 SF existing sports complex at Freeman High School. All the natural grass field was replaced with synthetic turf. Other project scope included new asphalt and track surfacing in both the east and west D-Zone within oval track, including restriping of existing track and new curbing; upgraded field lighting; upgraded storm drain system and install of field water wash system; new track and field event components, football and soccer goal posts, jump pits, and shot put/discus pads; asphalt repairs at field approach; fabrication and install of new gate at main entrance.