This project consisted of demolition and new construction of 94,750 SF building at the existing facility. Work for the project was phased. Phased construction included demolition of the existing facility (Ph.1) and construction of new facility (Ph. 2 & 3).

Components of work include, but are not limited to structure demolition; concrete work; structural masonry and masonry veneer; structural steel framing with metal stud infill; steel joist roof and floor framing with metal deck; metal pan stairs; miscellaneous treated woods; building insulation, metal roofing and wall panels; TPO roofing; hollow metal doors and frames; wood doors; aluminum storefront;  overhead sectional and coiling doors; insulated translucent panels, glazing, door hardware; gypsum board; various interior floor, wall, and ceiling finishes; painting; hydraulic elevator, paint booth; overhead bridge, monorail, and jib cranes; installation of aluminum windows; interior partitions, doors and wall systems; new restrooms; HVAC and plumbing modifications; and electrical improvements.