Yakima Valley Tech Center
Yakima, WA
Budget: $10,272,080
A two Story 41,107 SF building, built on approximately a 9 acre lot. The building includes admin offices, building operations, common spaces, and 9 classroom/labs. The first floor houses 4 programs including a large kitchen for the restaurant/ entrepreneur training. Also included on the first floor are labs for the medical career/nursing, allied health, and aeronautical technician training/Instruction. The second floor consist of classrooms/labs for fashion merchandising, computer science, bilingual careers/ educational interpreter, legal assistant, and graphic technology. |
|
 |