Altek Manufacturing
Colville, WA
Budget: $2,750,000
Design/build manufacturing facility, 150,000 SF steel framed building with tilt-up concrete walls and single ply roof system. Also, included were 10,000 SF offices with features of blue tinted azurite windows and a large reception area with 20' high ceilings.
| |
|